Search
Close this search box.

Manipulative shores

General information

The total area of ​​the operational waterfront of the cargo port of Gaženica is about 200,000 square meters. This area includes areas for storage, cargo handling, container terminals, and other necessary infrastructure that enables the efficient functioning of the port and the handling of various types of cargo.

There is also a large storage area in the cargo port, which consists of an open warehouse with an area of ​​150,000 m2, a closed warehouse with an area of ​​30,600 m2, a conditioned warehouse for +0 degrees Celsius with an area of ​​3,400 m2, a tank for liquid cargo with a volume of 75,000 m3 and a tank for VCM with a volume of 9,000 m3 .

Pier 1 - terminal for liquid cargo

Length: 60 m (for boat mooring up to 190 m)
Depth: from 10.3 m to 12 m

Pier 2 - terminal for supplying oil platforms

Length: 180 m
Depth: from 4.8 m to 7.1 m

Pier 3 - bulk cargo terminal

Length: 140 m
Depth: 12 m

Pier 4 - terminal for transshipment of general cargo

Length: 135 m
Depth: from 7 m to 11.4 m

Pier 5 - general cargo transshipment terminal

Length: 170 m
Depth: from 7 m to 8.7 m

Pier 6 - general cargo transshipment terminal with RO-RO ramp

Length: 150 m
Depth: from 8.7 m to 10.2 m